Introduction

This assignment from a corporate client involved conducting a topographical survey of internal, external and main drains of Industrial Area Sector 1 to 11 of NOIDA, for preparation of a Development Project Report of storm water project.

The survey encompassed -

bullet Size and sectional details of existing drains

bullet Topographical survey along the drains and at junctions.

bullet Direction of flow.

bullet Complete size of ramps (including its material) covering the drain at certain locations.

bullet Complete details of encroachment on the drains.

bullet Location, size and invert levels of culverts.

bullet Width of existing roads/streets including the type of road (bituminous / concrete).

foto
foto

The survey aimed at identifying and locating points where industrial effluents were being discharged into the system.